Since the construction of the frame of the Main Lodge, our awesome building crew has returned to the Fritts Directors Cottage to complete the inside work. They have been working for two weeks on installing the insulation, electrical wiring and sheetrock.
Andrew and his father-in-law, Larry, will return to Ukraine on Wednesday, September 3rd. They will be working with the builders to complete the house by mid September so that Andrew & Jenny can move in. They will serve as the first directors of the camp and will oversee the construction of the rest of the camp.
Here are pictures from the inside of the Fritts Directors Cottage...
This is the front wall of the house.You can see the front door and front living room window.
This is the back corner of the house. It is actually the kitchen area.
Builders installing sheetrock on bathroom walls.The window which you see is the kitchen window and the man in blue
is blocking the entry to the master bedroom.
The green sheetrock is the outside wall with both living room and kitchen windows showing.The gray sheetrock on the rightside of the picture is the bathroom corner.
This is the inside of the master bedroom looking out into the living room.The wooden studs visible is the inside wall seperating the office & bedroom from the living room.