This week, the men have been working hard to cover the exterior walls with OSB (plywood) ready for winter. As you can see from the photos below, the building is now ready for windows and doors. They should be installed on Friday. Next week, we should be covering the outside of the walls with a Tyvek vapor barrier protection and then vinyl siding.
No comments:
Post a Comment