During February, the men have been working extra hard to insulate the main lodge. Keep in mind that temperatures have been well below freezing and there has previously been no insulation and the wind just blows in the building. However, we praise God that with the combination of insulation and warming temperatures, it is easier to work in the lodge these days.

Here are a few pictures of the lodge bunk rooms...


Insulation being installed in the walls and ceiling.

Sheetrock going up on the walls and ceiling in one of the side rooms.

The central bunk room (with a loft) is completed
and ready to be taped, mudded and painted.